@ -412,10 +412,10 @@ REDES1 DLOAD DSU
|
||||
# *********************************************************************
|
||||
#
|
||||
# RGVGCALC COMPUTATIONS ARE AS FOLLOWS:--
|
||||
# VELOCITY RELATIVE TO THE SURFACE
|
||||
# VELOCITY RELATIVE TO THE SURFACE:
|
||||
# _______ _ _ __
|
||||
# ANGTERM = V + R * WM
|
||||
# STATE IN GUIDANCE COORDINTES:
|
||||
# STATE IN GUIDANCE COORDINATES:
|
||||
# ___ * _ ____
|
||||
# RGU = CG (R - LAND)
|
||||
# ___ * _ __ _
|
||||
@ -960,7 +960,7 @@ RODCOMP INHINT
|
||||
XCH OLDPIPAZ
|
||||
XCH RUPTREG3
|
||||
|
||||
EXTEND # SHAPSHOT TIME OF PIPA READING.
|
||||
EXTEND # SNAPSHOT TIME OF PIPA READING.
|
||||
DCA TIME2
|
||||
# Page 817
|
||||
DXCH THISTPIP
|
||||
@ -1093,7 +1093,7 @@ AFCSPOT DLOAD # (2), (4), OR (6)
|
||||
2D
|
||||
STODL /AFC/ # (0)
|
||||
ITRPNT2 EXIT
|
||||
DXCH MPAC # MPAC = MEASURED ACCELARATION.
|
||||
DXCH MPAC # MPAC = MEASURED ACCELERATION.
|
||||
TC BANKCALL
|
||||
CADR THROTTLE +3
|
||||
TC INTPRET
|
||||
@ -1257,11 +1257,11 @@ DESCBITS MASK BIT7 # COME HERE FROM MARKRUPT CODING WITH BIT
|
||||
#
|
||||
# PRECAUTION: ROOTPSRS MAKES NO CHECKS FOR OVERFLOW OR FOR IMPROPER USAGE. IMPROPER USAGE COULD
|
||||
# PRECLUDE CONVERGENCE OR REQUIRE EXCESSIVE ITERATIONS. AS A SPECIFIC EXAMPLE, ROOTPSRS FORMS A DERIVATIVE
|
||||
# COEFFICIENT TABLE BY MULTIPLYINE EACH A(I) BY I, WHERE I RANGES FROM 1 TO N. IF AN ELEMENT OF THE DERIVATIVE
|
||||
# COEFFICIENT TABLE = 1 OR >1 IN MAGNITUDE, ONLY THE EXCESS IS RETAINED. ROOTPSRS MAY CONVERGE ON THE COREECT
|
||||
# COEFFICIENT TABLE BY MULTIPLYING EACH A(I) BY I, WHERE I RANGES FROM 1 TO N. IF AN ELEMENT OF THE DERIVATIVE
|
||||
# COEFFICIENT TABLE = 1 OR >1 IN MAGNITUDE, ONLY THE EXCESS IS RETAINED. ROOTPSRS MAY CONVERGE ON THE CORRECT
|
||||
# ROOT NONETHELESS, BUT IT MAY TAKE AN EXCESSIVE NUMBER OF ITERATIONS. THEREFORE THE USER SHOULD RECOGNIZE:
|
||||
# 1. USER'S RESPONSIBILITY TO ASSUR THAT I X A(I) < 1 IN MAGNITUDE FOR ALL I.
|
||||
# 2. USER'S RESPONSIBILITY TO ASSURE OVERFLOW WILL NOT OCCUR IN EVALUTATING EITHER THE RESIDUAL OR THE DERIVATIVE
|
||||
# 2. USER'S RESPONSIBILITY TO ASSURE OVERFLOW WILL NOT OCCUR IN EVALUATING EITHER THE RESIDUAL OR THE DERIVATIVE
|
||||
# POWER SERIES. THIS OVERFLOW WOULD BE PRODUCED BY SUBROUTINE POWRSERS, CALLED BY ROOTPSRS, AND MIGHT NOT
|
||||
# PRECLUDE EVENTUAL CONVERGENCE.
|
||||
# 3. AT PRESENT, ERASABLE LOCATIONS ARE RESERVED ONLY FOR N UP TO 5. AN N IN EXCESS OF 5 WILL PRODUCE CHAOS.
|
||||
|