Merge branch 'master' into rename

This commit is contained in:
Alhadis
2016-07-13 18:02:59 +10:00
92 changed files with 234 additions and 235 deletions

View File

@ -30,11 +30,11 @@
# COELLIPTIC SEQUENCE INITIATION (CSI) PROGRAMS (P32 AND P72)
#
# MOD NO -1 LOG SECTION -- P32-P35, P72-P75
# MOD BY WHITE, P. DATE 1 JUNE 67
# MOD BY WHITE.P DATE 1JUNE67
#
# PURPOSE
# (1) TO CALCULATE PARAMETERS ASSOCIATED WTIH THE TIME FOLLOWING
# (1) TO CALCULATE PARAMETERS ASSOCIATED WITH THE TIME FOLLOWING
# CONCENTRIC FLIGHT PLAN MANEUVERS -- THE CO-ELLIPTIC SEQUENCE
# INITIATION (CSI) MANEUVER AND THE CONSTANT DELTA ALTITUDE
# (CDH) MANEUVER.
@ -44,14 +44,14 @@
# (3) TO DISPLAY TO THE ASTRONAUT AND THE GROUND DEPENDENT VARIABLES
# ASSOCIATED WITH THE CONCENTRIC FLIGHT PLAN MANEUVERS FOR
# APPROVAL BY THE ASTRRONAUT/GROUND.
# APPROVAL BY THE ASTRONAUT/GROUND.
# (4) TO STORE THE CSI TARGET PARAMETERS FOR USE BY THE DESIRED
# THRUSTING PROGRAM.
#
# ASSUMPTIONS
# (1) AT A SELECTED TPI TIME THE LINE OF SIGNT BETWEEN THE ACTIVE
# (1) AT A SELECTED TPI TIME THE LINE OF SIGHT BETWEEN THE ACTIVE
# AND PASSIVE VEHICLES IS SELECTED TO BE A PRESCRIBED ANGLE (E)
# FROM THE HORIZONTAL PLANE DEFINED BY THE ACTIVE VEHICLE
# POSITION.
@ -72,7 +72,7 @@
# IGNITION.
# (6) THE PERICENTER ALTITUDE OF THE ORBIT FOLLOWING CSI AND CDH
# MUST BE GREATER THAN 35,000 FT (LUNAR ORBIT) OR 85 NM (EARCH
# MUST BE GREATER THAN 35,000 FT (LUNAR ORBIT) OR 85 NM (EARTH
# ORBIT) FOR SUCCESSFUL COMPLETION OF THIS PROGRAM.
# (7) THE CSI AND CDH MANEUVERS ARE ORIGINALLY ASSUMED TO BE
@ -107,7 +107,7 @@
# CALCULATES THE MANEUVER PARAMETERS. SET AT THE START OF
# EACH RENDEZVOUS PRE-THRUSTING PROGRAM.
#
# FINAL FLAG -- SELECTES FINAL PROGRAM DISPLAYS AFTER CREW HAS
# FINAL FLAG -- SELECTS FINAL PROGRAM DISPLAYS AFTER CREW HAS
# COMPLETED THE FINAL MANEUVER COMPUTATION AND DISPLAY
# CYCLE.
#